In analogy to the leeward hull we’ve started the windward hull with the bottom and the bulkheads.
The next step is to glue the stringer is and shape them (if required)
Proa building blog
In analogy to the leeward hull we’ve started the windward hull with the bottom and the bulkheads.
The next step is to glue the stringer is and shape them (if required)