Leeward hull finished

Unfortunately, our workshop is a little bit to small to work on both hulls at the same time. To gain space for the growing windward hull we decided to seal the leeward hull entirely from moisture and store it outdoor.

Deck is sealed with epoxy. The ugly white fabric with the black stripes is peelply. It will be removed just before we paint the hull.
Exhausted but happy: the leeward hull outside the workshop for the first time ever! It weights 190 kg, but no problem for girl power.

Leave a Reply

Your email address will not be published. Required fields are marked *